New heater: trench, lines and equipment pad

A full heater install: a trench across the yard for the new line, then the heater set and plumbed on the equipment pad.

  1. Trench dug across the yard for the new line.
    01 · WorkTrench dug across the yard for the new line.
  2. Pipe laid out, ready to go in.
    02 · WorkPipe laid out, ready to go in.
  3. Pump and valves re-plumbed.
    03 · RepairPump and valves re-plumbed.
  4. New heater plumbed in on the equipment pad.
    04 · ResultNew heater plumbed in on the equipment pad.

Photos and clips from our own job in North Lauderdale, FL. Location shown by city only, to protect our client's privacy.